The 4-Day Kitchen: what $13,999 includes
Offer terms · Christmas kitchen offer, expires December 25, 2026 · Updated 11 November 2026 · NorthAxis Construction Group Inc · CSLB Lic. #1160747
This page says exactly what the $13,999 4-Day Kitchen is: what it includes, what it does not, which kitchens it fits, how the four days work and how the Christmas offer works. It is written so there are no surprises on either side. Your signed contract includes these terms; if anything here and the contract ever differ, the contract governs.
$13,999one price for everything in section 3
4 daysworking days on site; if it runs longer, the price does not change (section 6)
10 × 10 ftthe largest kitchen the price covers
1The price
$13,999 is the complete price for the work listed in section 3, for one kitchen that meets section 2, with the layout left as it is. It covers the labor, the materials named in section 3, the demolition and the haul-away. It is the price you see on the kitchen page, and it is the price that goes into your written contract before any work starts.
Anything not listed in section 3 is not part of the $13,999. Section 4 lists the things people most often ask about.
2Which kitchens qualify
- Size: kitchens up to 10 × 10 ft.
- Layout stays as it is: the cabinets, sink, stove and refrigerator stay where they are now. Nothing is moved, added or removed from the floor plan. No plumbing is relocated or added, and no electrical is relocated.
- No islands. An island is never part of this offer. If you want one, it is priced on its own, outside the $13,999.
- Where: the counties listed on the kitchen page.
- One kitchen per $13,999.
We confirm your kitchen qualifies at the free in-home consultation, before anything is signed. A kitchen that is larger than 10 × 10 ft, or that needs anything in section 4 before the new kitchen can go in (new electrical, moved plumbing, flooring, a layout change), is welcome; it is priced on its own, in writing, at that visit.
3What is included
- New cabinets in white or grey, 5/8-inch plywood, not particle board. They are in stock, so there is no cabinet order to wait on.
- Quartz counters.
- A 6-inch backsplash along the counters. No tile.
- Cabinet hardware: pulls and knobs, in chrome, brushed nickel, black or gold, with pulls in 5-inch or 6-inch. Those finishes and sizes only.
- A new sink and faucet, supplied by us: a stainless steel undermount single-bowl chef’s sink and a pull-down chef’s faucet in chrome, brushed nickel, black or gold. Those two only, in those finishes.
- Demolition and haul-away of the old cabinets and counters.
- Your existing appliances disconnected and reconnected in their current spots.
- Paint touch-up on the kitchen walls where the old cabinets and counters came out. Not a full repaint of the kitchen.
- Our Christmas gift: a pull-out trash can cabinet upgrade. One of the base cabinets in your layout is built as a pull-out trash can cabinet, at no extra charge.
- A 1-year craftsmanship warranty on our installation work (section 7).
The quartz color, the sink, the faucet and the hardware are the ones we supply for this offer. A different color, finish, brand, model or sink style is not part of the $13,999.
4What is not included
- Flooring.
- Appliances. We reconnect the ones you have; we do not supply new ones.
- Electrical work: new outlets, circuits, lighting, or moving anything electrical.
- Moving or adding plumbing: the sink stays where it is, on the existing supply and drain lines.
- Permit fees, where your city requires a permit.
- Tile of any kind.
- Islands. Never part of this offer, whatever the size of the kitchen; an island is priced on its own.
- Layout changes: cabinets in new places, walls, windows or doors moved or removed.
- Anything not listed in section 3.
5If we find a problem behind the old kitchen
Some things cannot be seen until the old cabinets and counters come out: water damage, rot or mold, pests, a subfloor or wall that is out of level or damaged, or old plumbing or wiring that is not safe to reconnect. Fixing those is not part of the $13,999.
If we find one, we stop, show it to you, and give you a written change order with the price for the fix. Nothing happens to it until you sign that change order. Days lost to a problem like this do not count toward the four days.
6The four days, and what happens if it takes longer
- “4 days” means four working days on site: the days our crew is in your kitchen, Monday to Friday.
- The count starts on the first day of demolition, on the start date in your contract.
- A working day can run up to 10 hours on site when the work needs it, and you agree to give our crew that access.
- The cabinets are in stock, so the start date does not wait on a cabinet order.
If the job takes longer than four working days, it is because of something nobody could plan for: weather, a problem found behind the old kitchen (section 5), a day we cannot get into the home, extra work you ask for along the way, or another event outside our control. Those days do not count toward the four. The job simply continues on the next working day until your kitchen is finished.
The price does not go up because of it. The $13,999 for the work in section 3 stays $13,999 however many days it takes. The only extra charges are a fix or an addition you have approved in writing, at the price on that change order.
7The 1-year craftsmanship warranty
For one year from the day we finish, if something we installed fails because of how we installed it, we come back and fix it at no charge. The warranty covers our workmanship. It does not cover damage caused by something other than our work (a leak from a pipe we did not touch, an appliance, a flood, an impact), normal wear, misuse, or changes made by anyone else. This warranty is in addition to any rights you have under California law.
8The Christmas offer
- The offer price is $13,999 through December 24, 2026. The offer expires December 25, 2026. A request that reaches us after that is priced at the consultation.
- Send your request by December 24 (the form on the kitchen page, a call to (213) 565-5742, or an email we receive by 11:59 PM Pacific on December 24) and we hold the $13,999 price for your kitchen, provided it meets section 2 when we see it.
- The gift comes with the offer. Every 4-Day Kitchen requested by December 24 and contracted at the $13,999 price includes the pull-out trash can cabinet upgrade in section 3. It is part of the kitchen, not a separate item.
- A plate set for your new kitchen, through the pop-up only. The kitchen page shows a pop-up with one more gift. Send your request through that pop-up by December 24, go ahead with your 4-Day Kitchen, and once we start the work a plate set is yours at no extra charge. A request sent any other way does not include the plate set, and there is no plate set if the kitchen does not go ahead.
- $13,999 is the price in the contract we offer you at the consultation. Sign it and the price is fixed. If you decide later, the kitchen is priced at that time.
9How it works, step by step
- You send a request with your name, phone, email and ZIP code.
- We reach out by phone or email and set up the free in-home consultation.
- We come out, look at the kitchen, confirm it qualifies and go over the scope with you. No charge.
- You get the contract: the scope, the price and the start date in writing. California requires a written home improvement contract, and nothing starts until you have signed it.
- We build it in four working days on site and keep you updated as we go.